Image from Google Jackets

In one year, 78 alcohol projects passed

Material type: TextTextLanguage: English Publication details: Sao Paulo, BR Gazeta Mercantil 1976Description: 1 pSubject(s): LOC classification:
  • 7978
Summary: La CNAL (Comison Nacional del Alcohol), en Brasil, aprobo en un ano 78 proyectos sobre alcohol: 53 sobre nuevas plantas y 25 sobre planes de ampliacion. Solo 2 de ellos se relacionan con la fabricacion de alcohol de yuca. Hay un tercer proyecto (60.000 l./dia) en Curvelo, Minas Gerais, que no fue incluido en la lista de CNAL sino directamente aprobado por el Ministerio de Industria y Comerico. (CIAT)Summary: In one year, 78 alcohol project were approved by the National Alcohol Commission (CNAL) in Brazil: 53 involved new plants and 25 involved expansion plans. Only 2 of these involved the manufacture of alcohol from cassava; a 3rd cassava project (60,000 liters/day) in Curvelo, Minas Gerais was not included on the CNAL list but directly approved by the Ministry of Trade and Industry. (CIAT)
Tags from this library: No tags from this library for this title.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode Item holds
Books Books CIAT Library Document collection CINFOS Document Collection CINFOS 7978 (Browse shelf(Opens below)) c.1 Short Loan 100066561
Total holds: 0

La CNAL (Comison Nacional del Alcohol), en Brasil, aprobo en un ano 78 proyectos sobre alcohol: 53 sobre nuevas plantas y 25 sobre planes de ampliacion. Solo 2 de ellos se relacionan con la fabricacion de alcohol de yuca. Hay un tercer proyecto (60.000 l./dia) en Curvelo, Minas Gerais, que no fue incluido en la lista de CNAL sino directamente aprobado por el Ministerio de Industria y Comerico. (CIAT) spa

In one year, 78 alcohol project were approved by the National Alcohol Commission (CNAL) in Brazil: 53 involved new plants and 25 involved expansion plans. Only 2 of these involved the manufacture of alcohol from cassava; a 3rd cassava project (60,000 liters/day) in Curvelo, Minas Gerais was not included on the CNAL list but directly approved by the Ministry of Trade and Industry. (CIAT) eng

Powered by Koha